MBC Scope 1, 2 & 3 Carbon Target – 2025

Reduce Scopes 1,2 & 3 Emissions (excluding construction process) as follows:

Office Emissions – Gas (10% reduction) = 20.7 tons – 10% = 18.63 tons

Office Emissions – Electricity (10% reduction) = 15.7 tons – 10% = 14.13 tons

Construction Process

Our 2025 target is the reduction of diesel use on our construction sites based on the following 2024 information.

Total carbon emissions based on diesel generator monitoring x 2 projects of similar value (£10 million)

76253.6 KgCO2 = 76.2 tons

Total diesel emissions from groundworks plant (dumpers, excavators) x 2 projects of similar value (£10 million)

100 litres per day x 2.67 = 267kg x (40 x 5) = 200 x 267 = 53400 kg CO2

= 53 tons x 2 (projects)

= 106 tons CO2

Through the use of more efficient plant where possible (see Telemetrics info) we are looking to reduce the emissions from plant in 2025 by 53 tons

Our 2025 target is to reduce carbon emissions from diesel use by 129.2 tons